Modular surface functionalization of polyisobutylene-based materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10314945
APP PUB NO 20170216492A1
SERIAL NO

15490080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymer composite includes a functionalized polyisobutylene and an additional polyisobutylene-containing material. The functionalized polyisobutylene includes an α-lipoic acid functional group. A method for producing the polymer composite includes providing the additional polyisobutylene-containing material as a substrate having a surface, and coating the surface of the substrate with the functionalized polyisobutylene. A method for producing a coated substrate including the polymer composite includes providing a polymer combination including the functionalized polyisobutylene and the additional polyisobutylene-containing material, and depositing the polymer combination on to a substrate to thereby form the coated substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNIVERSITY OF AKRON302 BUCHTEL COMMON AKRON OH 44325

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Albarran, Alejandra Alvarez Allison Park, US 6 1
Puskas, Judit E Akron, US 30 556
Rosenthal-Kim, Emily Q Dublin, US 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00