Filter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10312564
APP PUB NO 20180302056A1
SERIAL NO

15591212

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A filter is disposed on a base board. The filter includes a first portion, a second portion, a ground portion, a first coupling portion and a second coupling portion. The first portion is disposed on a first layer in the base board to input signals. The second portion is disposed on the first layer to output signals. The ground portion is disposed on a second layer in the base board. The first coupling portion is disposed on the first layer. The first coupling portion is electrically coupled to the first portion and the second portion. The first coupling portion is electrically coupled to the ground portion through via holes. The second coupling portion is disposed on the first layer. The second coupling portion is electrically coupled to the first portion and the second portion. The second coupling portion is electrically coupled to the ground portion through the via holes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMBIT MICROSYSTEMS (SHANGHAI) LTDNO 1925 NANLE ROAD SONGJIANG EXPORT PROCESSING ZONE SHANGHAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Den, Shii-Rong New Taipei, TW 5 36
Hsu, Ming-Hsien New Taipei, TW 11 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00