Substrate processing method, and substrate processing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10312114
APP PUB NO 20160247698A1
SERIAL NO

15028243

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This substrate processing method includes supplying a chemical liquid to an upper surface of a substrate and rinsing away the chemical liquid adhering to the upper surface of the substrate by holding a puddled rinse liquid on the substrate while maintaining a rotation speed of the substrate at a zero or low speed, and a chemical liquid puddle step of holding a liquid film of a puddled chemical liquid on the upper surface of the substrate while maintaining the rotation speed of the substrate at a zero or low speed, and the rinsing step is performed subsequent to finishing the chemical liquid puddle step, and the rinsing step includes supplying a rinse liquid to the upper surface of the substrate and then replacing the liquid film of the chemical liquid held on the upper surface of the substrate with the rinse liquid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCREEN HOLDINGS CO LTDKAMIKAWA NAKAGAWA TEMPLE IN TOKYO KYOTO PREFECTURE JAPAN (POSTCODE 602-8585) JINGDU CITY KYOTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higuchi, Ayumi Kyoto, JP 31 153
Yoshizumi, Asuka Kyoto, JP 7 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00