Apparatus and method for performing beamforming operation in communication system supporting frequency division-multiple input multiple output scheme

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10305584
APP PUB NO 20170111084A1
SERIAL NO

15298795

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pre-5th-generation (5G) or 5G communication system for supporting higher data rates beyond 4th-generation (4G) communication system, such as a long term evolution (LTE), is provided. A method for performing a beamforming operation in a communication system supporting a frequency division-multiple input multiple output (FD-MIMO) scheme is provided. The method includes detecting a rough beam of a first dominant beam, detecting at least two codeword candidates based on the rough beam of the first dominant beam, and selecting one of the at least two codeword candidates as a final codeword.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Tae-Young Seoul, KR 253 3899
Lee, Keon-Kook Suwon-si, KR 20 137
Love, David J West Lafayette, US 33 634
Seol, Ji-Yun Seongnam-si, KR 88 2119
Song, Ji-Ho West Lafayette, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00