Method of manufacturing laminated core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10298102
APP PUB NO 20170005551A1
SERIAL NO

15197258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a laminated core is provided. The manufacturing method includes the steps of feeding a belt-like sheet of core material to a progressive die, stamping out core pieces having a first shape from the core material, stacking more than one of the core pieces having the first shape to obtain a first laminate block, stamping out core pieces having a second shape from the core material, stacking more than one of the core pieces having the second shape to obtain a second laminate block, discharging a laminate including the first laminate block and the second laminate block from the progressive die, changing the lamination order of the laminate blocks constituting the laminate, and integrating the laminate after the lamination order of the laminate blocks are changed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI HIGH-TEC INCFUKUOKA PREFECTURE FUKUOKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukumoto, Takashi Kitakyushu, JP 93 770
Ogata, Mei Kitakyushu, JP 3 24
Sasaki, Katsuhiro Kitakyushu, JP 38 520

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00