Air cell cartridge and air cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10297871
APP PUB NO 20150132670A1
SERIAL NO

14383785

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object is to prevent leakage of an electrolysis solution and reduce pressure loss. All air cell cartridge includes a plurality of air cells each including a positive electrode material, a negative electrode material and an electrolysis solution layer holding an electrolysis solution and interposed between the positive electrode material and the negative electrode material and each being provided with an air flow path through which air passes so as to come into contact with the positive electrode material, wherein a leakage prevention material (S) is provided to absorb the electrolysis solution leaked from the electrolysis solution layer and swell so as to block up the air flow path (20).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTD2 TAKARA-CHO KANAGAWA-KU YOKOHAMA-SHI KANAGAWA 2210023 ?2210023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyazawa, Atsushi Kamakura, JP 55 540
Nagayama, Mori Yokohama, JP 29 231
Tsukada, Yoshiko Yokohama, JP 24 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00