Voltage-enhanced energy storage devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10297870
APP PUB NO 20180159179A1
SERIAL NO

15836038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides an energy storage device comprising at least one electrochemical cell comprising a negative current collector, a negative electrode in electrical communication with the negative current collector, an electrolyte in electrical communication with the negative electrode, a positive electrode in electrical communication with the electrolyte and a positive current collector in electrical communication with the positive electrode. The negative electrode comprises an alkali metal. Upon discharge, the electrolyte provides charged species of the alkali metal. The positive electrode can include a Group IIIA, IVA, VA and VIA of the periodic table of the elements, or a transition metal (e.g., Group 12 element).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AMBRI INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bradwell, David J Arlington, US 45 1144
Cui, Jianyi Andover, US 10 251
Elliott, Alex Bedford, US 10 172
Lee, Chia-Ying Cambridge, US 96 1524
Thompson, Greg A Arlington, US 10 243
Tite, Denis Brighton, US 4 132
Yu, Xingwen San Marcos, US 9 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00