All-solid-state secondary battery, solid electrolyte composition and electrode sheet for batteries used in the same, and manufacturing method of electrode sheet for batteries and all-solid-state secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10297859
APP PUB NO 20170237115A1
SERIAL NO

15272644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An all-solid-state secondary battery includes a positive electrode active substance layer; a negative electrode active substance layer; and an inorganic solid electrolyte layer, in which at least one of the positive electrode active substance layer, the negative electrode active substance layer, or the inorganic solid electrolyte layer contains an inorganic solid electrolyte having conductivity of ions of metal belonging to Group 1 or 2 of the periodic table and a cellulose polymer.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATIONMINATO-KU TOKYO 106-8620

International Classification(s)

loading....
  • 2016 Application Filing Year
  • C09J Class
  • 1319 Applications Filed
  • 856 Patents Issued To-Date
  • 64.90 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20162017201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Makino, Masaomi Kanagawa, JP 93 391
Meguro, Katsuhiko Kanagawa, JP 61 620
Mimura, Tomonori Kanagawa, JP 132 1945
Mochizuki, Hiroaki Kanagawa, JP 164 855

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • C09J Class
  • 0 % this patent is cited more than
  • 6 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges7148301 - 1011 - 20051015202530354045505560657075

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030