Exhaust connection structure and combustion apparatus with exhaust connection structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10295181
APP PUB NO 20180119953A1
SERIAL NO

15337238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exhaust connection structure is constructed to connect a combustion apparatus and an exhaust tube having projections and recesses in an outer surface. The exhaust connection structure has a sealing member arranged on an outer circumferential surface of the exhaust tube and an exhaust joint arranged to sandwich the sealing member between the exhaust joint and the outer circumferential surface of the exhaust tube. The exhaust joint includes an engagement member and the engagement member has an annular portion and an engaging portion bent toward an inner circumference of the annular portion. The engaging portion is engaged with the projections and recesses in the exhaust tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO GAS RENOVATION CO LTD2F NF PARK BUILDING 2-9-15 FUTABA SHINAGAWA-KU TOKYO 142-0043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Takahide Kakogawa, JP 21 77
Kanamoto, Kiyomi Tokyo, JP 9 64
Matsuda, Shohei Ogaki, JP 70 1016
Matsunaga, Hironao Amagasaki, JP 21 137
Nagano, Takanori Kakogawa, JP 19 191
Satoh, Yasuhide Tokyo, JP 8 62
Sugatani, Masaki Akashi, JP 17 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00