Heat resistant spheroidal graphite cast iron, method of manufacturing the same and engine exhaust system part including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10294550
APP PUB NO 20170073798A1
SERIAL NO

15125477

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Heat resistant spheroidal graphite cast iron having an improved high temperature tensile strength includes carbon (C) in a range of 3.2-3.4 wt %, silicon (Si) in a range of 4.3-4.8 wt %, manganese (Mn) in a range of 0.2-0.3 wt %, molybdenum (Mo) in a range of 0.8-1.0 wt %, vanadium (V) in a range of 0.4-0.6 wt %, chrome (Cr) in a range of 0.2-0.4 wt %, niobium (Nb) in a range of 0.2-0.4 wt %, inevitable impurities, and a remainder of iron (Fe) based on a total weight of the heat resistant spheroidal graphite cast iron. The heat resistant spheroidal graphite cast iron further includes barium (Ba) in a range of 0.0045-0.0075 wt %. A content ratio of chrome (Cr) and barium (Ba) (Cr/Ba) is in a range from about 26 to about 89.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTDINCHEON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chung, Jong-Kwon Gyeonggi-do, KR 2 1
Hwang, Jae-Hyoung Gyeonggi-do, KR 2 1
Ju, Young-Kyu Seoul, KR 2 1
Jung, Ki-Hwan Gyeonggi-do, KR 2 1
Kim, Sang-Beom Seoul, KR 38 125
Shim, Dong-Seob Gyeonggi-do, KR 3 3
Yang, Sik Gyeonggi-do, KR 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00