Surface structure of wadded seat and method of manufacturing surface structure of wadded seat

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10293723
APP PUB NO 20160339819A1
SERIAL NO

15112834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A surface structure of wadded seat, with a trim cover having a plurality of trim cover pieces backed with wadding members and sewed together at ends, further includes: first sewed portions, each formed by sewing two adjacent trim cover pieces at one end of each trim cover piece, while serving as seam allowance, the portions not backed with the wadding members; second sewed portions, each formed first by forming a continuous trim cover piece, then by laying a long wadding member on the backs of the wadding members, and finally by sewing, at both ends of the continuous trim cover piece, the wadding members on the backs of the trim cover pieces and the long wadding member; and third sewed portions, each formed by sewing, at both ends of each first sewed portion, the long wadding member to the end of each trim cover piece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TACHI-S CO LTDAKISHIMA-SHI TOKYO 196-8611

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shindo, Takashi Ome, JP 27 138

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00