Input coupler for accelerating cavity and accelerator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10292252
APP PUB NO 20190008028A1
SERIAL NO

16062261

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An input coupler for an accelerating cavity includes a cylindrical external conductor; a cylindrical internal conductor arranged coaxially with the external conductor, inside of which a heating medium circulates; a plate provided between the inner surface of the external conductor and the outer surface of the internal conductor; a cooling part for cooling the plate from the external conductor side to the freezing point of water or lower; and a heat insulating part provided on the part at which the internal conductor and the plate are connected, the heat insulating part having lower thermal conductivity than that of the internal conductor. The plate is connected to the internal conductor via the heat insulating part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES MACHINERY SYSTEMS LTD1-1 WADASAKI-CHO 1-CHOME HYOGO-KU KOBE-SHI HYOGO 6528585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuda, Ryuichi Tokyo, JP 38 170
Okihira, Kazunori Hyogo, JP 2 5
Sennyu, Katsuya Hyogo, JP 19 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00