Amplification circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10291189
APP PUB NO 20180191313A1
SERIAL NO

15730241

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An amplification circuit includes a first amplifier circuit and a second-stage amplifier. The second-stage amplifier is connected to the amplifier to form a multi-stage amplification circuit. The first amplifier circuit includes a first-stage amplifier and a bypass circuit. The bypass circuit includes a first transistor. A first end of the first transistor is coupled to the input end of the first amplifier circuit, a second end of the first transistor is coupled to the output end of the first amplifier circuit, and a third end of the first transistor is coupled to a supply voltage. The first end of the first transistor is further coupled to a first control terminal to receive a control signal for controlling a bias voltage of the first transistor, so as to make the amplification circuit work in different operation modes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RICHWAVE TECHNOLOGY CORP3F NO 1 ALLEY 20 LANE 407 SECTION 2 TIDING BLVD NEIHU DISTRICT TAIPEI CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chih-Sheng Taipei, TW 110 193
Yeh, Chia-Jung Taipei, TW 6 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00