Methods of doping semiconductor materials and metastable doped semiconductor materials produced thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10290752
SERIAL NO

15586943

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The structures of base semiconductor materials such as Si are modified by the use of isotope transmutation alloying. A radioisotope such as Si31 is added into a base semiconductor material such as Si, and the radioisotope is transformed to a transmuted form within the crystal lattice structure of the base semiconductor material. A master alloy comprising a relatively large amount of radioisotope such as Si31 may initially be made, followed by introduction of the master alloy into the base semiconductor material. When Si31 is used as the radioisotope, it may be transmuted into P31 within an Si crystal lattice structure. Metastable semiconductor materials doped with otherwise insoluble amounts of selected dopants are produced as a result of the transmutation process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ST3 LLCHALETHORPE MD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Langan, Timothy J Catonsville, US 7 161
Petrovic, John J Cape Canerval, US 12 104
Vasudevan, A K Reston, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00