Straight fin tube with bended fins condensing heat exchanger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10288315
APP PUB NO 20180058718A1
SERIAL NO

15787060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A forced convection fin tube condensing heat exchanger for supplying heat includes a shell, burner and fin tubes bundle. The burner is at the top of the shell, circular fin tubes bundle installed around the burner tightly, circularly and coaxially. The flue channel which is formed by the shell and a row of fin tubes bundle is below the burner. The flue flows along the flue channel to flue outlet. There are front and rear water manifolds at the two ends of the fin tubes. Water baffles inside the rear water manifold divide the rear water manifold into water inlet and outlet areas. The water enters the small portion of circular fin tubes bundle from water inlet area, through the front water manifold, back to the water outlet area via the main portion of the circular fin tubes bundle. The use of bent fin tube to improves efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUZHOU CQ HEAT EXCHANGER CO LTDSUZHOU INDUSTRIAL PARK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Shuqing Fitchburg, US 13 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00