Method of increasing the safety of a power plant, and a power plant suitable for implementing the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10287978
APP PUB NO 20160061109A1
SERIAL NO

14931066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method of increasing the safety of a power plant provided with at least one heat engine and a gearbox (BTP), the engine driving the gearbox (BTP), the gearbox (BTP) having a lubrication system implemented using an aqueous medium stored in a reserve, in which method a fluid comprising water is injected into the heat engine to increase the power developed by the heat engine without increasing the temperature of a member of the heat engine or to decrease the temperature without modifying the power developed by the engine, the fluid being taken from the reserve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS HELICOPTERSAEROPORT INTERNATIONAL MARSEILLE-PROVENCE MARIGNANE CEDEX 13725

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corpron, Alban Salon de Provence, FR 11 97
Dyrla, Frederic Bouc Bel Air, FR 6 6
Vialle, Michel Aix en Provence, FR 10 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00