Supercritical CO2 generation system applying recuperator per each heat source

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10287926
APP PUB NO 20170114673A1
SERIAL NO

15298837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is a supercritical CO2 generation system using plural heat sources, including: a pump configured to circulate a working fluid; plural heat exchangers configured to heat the working fluid using an external heat source; plural turbines configured to be driven by the working fluid heated by passing through the heat exchanger; and plural recuperators configured to exchange heat between the working fluid passing through the turbine and the working fluid passing through the pump to cool the working fluid passing through the turbine and heat the working fluid passing through the pump, in which the heat exchanger may include plural constrained heat exchangers having an emission regulation condition of an outlet end and plural heat exchangers without the emission regulation condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cha, Song Hun Osan-si, KR 15 31
Jang, Jun Tae Seoul, KR 9 17
Kim, Hak Soo Yongin-si, KR 82 332
Kim, Sang Hyeun Yongin-si, KR 7 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00