Semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10283360
APP PUB NO 20180158669A1
SERIAL NO

15886372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for manufacturing a semiconductor device include forming a gate line extending in a first direction in a substrate, and an impurity region on a side surface of the gate line, forming an insulating film pattern on the substrate, the insulating film pattern extending in the first direction and comprising a first through-hole that is configured to expose the impurity region, forming a barrier metal layer on the first through-hole, forming a conductive line contact that fills the first through-hole and that is electrically connected to the impurity region, forming a first mask pattern on the conductive line contact and the insulating film pattern, the first mask pattern extending in a second direction that is different from the first direction and the first mask pattern comprising a first opening, and removing corners of the barrier metal layer by partially etching the barrier metal layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong Oh Daegu, KR 21 33
Kim, Yong Jae Seoul, KR 136 1272
Lee, Ki Seok Busan, KR 39 101
Yoon, Chan Sic Anyang-si, KR 12 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00