System for producing an output light beam of a given spectrum

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10261330
APP PUB NO 20170059126A1
SERIAL NO

14834506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for producing an output light beam of a given spectrum is provided. The system comprises: a light source; a separator configured to separate an input light beam, from the light source, into a retained light beam directed along a first path and an excess light beam directed along a second path, based on wavelength of the input light beam; an optical power shifter positioned to intercept the excess light beam, the optical power shifter configured to convert the excess light beam into a power-shifted light beam comprising at least some wavelengths and/or power red-shifted relative to the excess light beam; and a combiner positioned to intercept both the retained light beam and the power-shifted light beam, the combiner configured to combine the retained light beam and the power-shifted light beam onto a common path to produce the output light beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHRISTIE DIGITAL SYSTEMS USA INC10550 CAMDEN DR CYPRESS CA 90630

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adema, Daniel Robert Kitchener, CA 26 77
Guthrie, Simon Kitchener, CA 12 86
Hill, Graham Waterloo, CA 18 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00