Reinforced lower handle for hand tool assembly and method of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10259113
APP PUB NO 20180099402A1
SERIAL NO

15839490

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hand tool assembly generally comprising a handle and a tool head combined by a connector. The handle has a first end and a second end. The connector has a first end and a second end. The first end of the connector is combined with the second end of the handle. The second end of the connector is combined with the head of a tool by inserting the connector into a socket/opening in the tool's head. The second end of the connector is flexible thereby allowing it to conform to the shape of the socket regardless of whether the socket is straight or curved. A rigid tube insert is positioned a short distance into the handle second end and extends a short distance outward from the handle second end. Adhesives, fasteners, internal hooks, or other commonly known methods of securing an object within an outer sheath or covering may be used to help secure the components together.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KRUPNICK SAMUEL13867 FONTANELLE SAN DIEGO CA 92128

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Krupnick, Samuel San Diego, US 2 6
Krupnick, William Kamas, US 2 6
Mackin, John Dublin, US 5 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00