Reforming device and method for manufacturing chemical products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10258960
APP PUB NO 20170096333A1
SERIAL NO

15377596

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reforming device (10) according to the present invention has a compressor (11), a first heat exchanger (12), a desulfurization device (13), a reformer (14), a raw material gas branching line (L11) that extracts a compressed natural gas (21) from a downstream side of the desulfurization device (13) with respect to the flow direction of the natural gas (21) and supplies the natural gas (21) to the reformer (14), and a flue gas discharging line (L12) that discharges a flue gas (22) generated in the reformer (14), wherein the first heat exchanger (12) is provided in the flue gas discharging line (L12), and the flue gas (22) is used as a heating medium of the compressed natural gas (21).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES ENGINEERING LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA-SHI KANAGAWA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miyamoto, Shuichi Tokyo, JP 6 57
Okuzumi, Naoya Tokyo, JP 4 4
Osora, Hiroyuki Tokyo, JP 27 198
Sakurai, Mikiya Tokyo, JP 11 113
Seiki, Yoshio Tokyo, JP 45 296
Shimura, Ryota Tokyo, JP 20 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00