Termination implant enrichment for shielded gate MOSFETs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10236340
APP PUB NO 20180315812A1
SERIAL NO

15581774

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a general aspect, a power semiconductor device can include a first trench shield electrode and a second trench shield electrode defined in a semiconductor region, the first and second trench shield electrodes each having a first portion disposed in an active region and a second portion disposed in a termination region. A trench of the first trench shield electrode and a trench of the second trench shield electrode can define a mesa of the semiconductor region therebetween. The device can further include an implant enrichment region disposed in the termination region, the implant enrichment region can be intersected by the first trench shield electrode and the second trench shield electrode, and can have a portion disposed in the mesa of the semiconductor region, the portion extending from the trench of the first trench shield electrode to the trench of the second trench shield electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR COMPONENTS INDUSTRIES LLC5701 N PIMA ROAD SCOTTSDALE AS 85250

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Xiaoli Shanghai, CN 14 6
Yedinak, Joseph Mountain Top, US 6 249

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00