Substrate supports with multi-layer structure including independent operated heater zones

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10236193
APP PUB NO 20170229327A1
SERIAL NO

15497992

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate support is provided, is configured to support a substrate in a plasma processing chamber, and includes first, second and third insulative layers, conduits and leads. The first insulative layer includes heater zones arranged in rows and columns. The second insulative layer includes conductive vias. First ends of the conductive vias are connected respectively to the heater zones. Second ends of the conductive vias are connected respectively to power supply lines. The third insulative layer includes power return lines. The conduits extend through the second insulative layer and into the third insulative layer. The leads extend through the conduits and connect to the heater zones. The heater zones are connected to the power return lines by the leads and are configured to heat corresponding portions of the substrate to provide a predetermined temperature profile across the substrate during processing of the substrate in the plasma processing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAM RESEARCH CORPORATIONFREMONT CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benjamin, Neil East Palo Alto, US 54 3259
Comendant, Keith Fremont, US 51 2326
Gaff, Keith Fremont, US 29 1478
Singh, Harmeet Fremont, US 164 5886

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00