System and process for mud solid control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10233707
APP PUB NO 20180016856A1
SERIAL NO

15527255

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for mud solid control includes a translational elliptical multilayer ultra-wide screen shaker, a degasser, a solid-liquid separator, a large capacity centrifugal machine and a collector for solid shales. The solid-liquid separator includes a base which is provided with a feed tank and vibrating supports. A vibrating tank is fixed to the vibrating supports, and screen drums, vibration motors and an anti-vibration driving motor are assembled on the vibrating tank. The anti-vibration driving motor is connected to the screen drums. Each of the screen drums includes an inner drum, an intermediate drum and an outer drum. The system and a corresponding process thereof can greatly simply and improve the process for mud solid control and relevant devices, improve usage effect, reduce cost, save electrical power, reduce occupied area and simply maintenance and management of devices involved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHANG JINNAN610500 NO 8 XINDU AVENUE SICHUAN CHENGDU CHENGDU CITY SICHUAN PROVINCE 610500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Xi Chengdu, CN 6 5
Li, Yujia Chengdu, CN 29 110
Zhang, Jingnan Chengdu, CN 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00