Honeycomb core for carrying catalyst and catalytic converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10232362
APP PUB NO 20180243734A1
SERIAL NO

15758638

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A honeycomb core for carrying a catalyst includes a flat metal foil and a corrugated metal foil, which are layered. The corrugated foil is configured by repeating a concavo-convex shaped part including a first top surface that is in contact with one of the flat foils, a second top surface that is in contact with another flat foil and is disposed at a position where the second top surface avoids the first top surface, and an inclined leg surface that has one end connected to the first top surface through a first bent part and another end connected to the second top surface through a second bent part, and extends in a direction inclined with respect to the first top surface and the second top surface, and has an offset part having different wave phases between front and rear in an axial direction of the honeycomb core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CHEMICAL & MATERIAL CO LTD13-1 NIHONBASHI 1-CHOME CHUO-KU TOKYO 1030027 ?1030027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inaguma, Tooru Tokyo, JP 14 73
Kasuya, Masayuki Tokyo, JP 17 91
Konya, Shogo Tokyo, JP 15 63
Omizu, Masafumi Tokyo, JP 3 1
Tsumura, Yasuhiro Tokyo, JP 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00