Spout for switchgear, switchgear having spout, and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10230221
APP PUB NO 20170222408A1
SERIAL NO

15485484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A spout for a connection between a bus bar and a circuit breaker in switchgear includes a housing and a fixed contact. The housing is formed of insulative material and includes a tubular body having an inner cavity and a radial first ventilation opening, a base portion having a first longitudinal opening, and a fixed contact receiving portion having a second longitudinal opening. The fixed contact is formed of a conductive material, has an outer contact surface exposed through the second longitudinal opening, and forms a portion of an outer surface of the spout. A switchgear includes a wall dividing a circuit breaker compartment from a bus bar compartment, and the base portion of the spout is securable to the wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBROWN BOVERI STRASSE 6 BADEN 5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Liying Shanghai, CN 7 8
Meng, He Shanghai, CN 10 9
Ren, Xuhui Shanghai, CN 10 33
Wu, Hao Shanghai, CN 930 3100
Xing, Rui Shanghai, CN 8 9
Zheng, Fangwei Shanghai, CN 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00