Thermoplastic resin composition and article produced therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10227488
APP PUB NO 20170190908A1
SERIAL NO

15392106

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are a thermoplastic resin composition and a molded article produced from the thermoplastic resin composition. The thermoplastic resin composition includes: a polycarbonate resin; a rubber-modified vinyl graft copolymer; inorganic fillers comprising talc and wollastonite; maleic anhydride-modified olefin wax; and a phosphorus compound represented by the following Formula 1, wherein a weight ratio of the talc to the wollastonite ranges from about 1:0.1 to about 1:0.9, and a weight ratio of the talc to the phosphorus compound ranges from about 1:0.005 to about 1:0.05:

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LOTTE ADVANCED MATERIALS CO LTD334-27 YEOSUSANDAN-RO YEOSU-SI JEOLLANAM-DO YEOSU-SI 59616

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chin, Kyuong Sik Uiwang-si, KR 11 34
Choi, Ki Hong Uiwang-si, KR 23 58
Choi, Sung Hun Uiwang-si, KR 9 14
Ha, Dong In Uiwang-si, KR 22 38
Lee, Hyun Ho Uiwang-si, KR 71 489
Shin, Seung Shik Uiwang-si, KR 24 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00