Method of producing semiconductor chips that efficiently dissipate heat

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10224393
APP PUB NO 20170271438A1
SERIAL NO

15614917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a plurality of semiconductor chips includes a) providing a carrier substrate having a first major face and a second major face opposite the first major face; b) forming a diode structure between the first major face and the second major face, the diode structure electrically insulating the first major face from the second major face at least with regard to one polarity of an electrical voltage; c) arranging a semiconductor layer sequence on the first major face of the carrier substrate; and d) singulating the carrier substrate with the semiconductor layer sequence into a plurality of semiconductor chips.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSRAM OLED GMBHREGENSBURG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Böhm, Bernd Obertraubling, DE 7 16
Dennemarck, Jens Regensburg, DE 8 23
Günther, Ewald Karl Michael Regenstauf, DE 4 18
Kämpf, Mathias Burglengenfeld, DE 10 16
Perzlmaier, Korbinian Regensburg, DE 77 311
Plöβl, Andreas Regensburg, DE 16 25
Veit, Thomas Mintraching, DE 48 1730
Zull, Heribert Regensburg, DE 21 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00