Rail manufacturing method and manufacturing equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10214795
APP PUB NO 20160040263A1
SERIAL NO

14770664

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Rail manufacturing method performs, on at least a head of the rail that is hot after hot-rolled at an austenite region temperature or higher or after heated to the austenite region temperature or higher, forced cooling: for 10 seconds from start of the forced cooling so that a cooling rate at a surface of the head becomes 1° C./s to 20° C./s; during a period after a lapse of 10 seconds from the start until heat generation during transformation begins at the surface so that the cooling rate becomes 1° C./s to 5° C./s; during transformation from beginning to end of the heat generation during transformation so that the cooling rate becomes lower than 1° C./s or a temperature-rising rate becomes 5° C./s or lower; and during a period after the end of the heat generation during transformation until temperature at the surface becomes 450° C. or lower so that the cooling rate becomes 1° C./s to 20° C./s.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATION2-3 UCHISAIWAI-CHO 2-CHOME CHIYODA-KU TOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Hiroyuki Tokyo, JP 240 4004
Kijima, Hideo Tokyo, JP 18 13
Okushiro, Kenji Tokyo, JP 9 8
Yamaguchi, Moriyasu Tokyo, JP 5 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00