System and method for manufacturing planarized extreme ultraviolet lithography blank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10209613
APP PUB NO 20160274454A1
SERIAL NO

15167740

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated extreme ultraviolet (EUV) blank production system includes: a vacuum chamber for placing a substrate in a vacuum; a first deposition system for depositing a planarization layer having a planarized top surface over the substrate; and a second deposition system for depositing a multi-layer stack on the planarization layer without removing the substrate from the vacuum. The EUV blank is in an EUV lithography system includes: an extreme ultraviolet light source; a mirror for directing light from the EUV source; a reticle stage for placing a EUV mask blank with a planarization layer; and a wafer stage for placing a wafer. The EUV blank includes: a substrate; a planarization layer to compensate for imperfections related to the surface of the substrate, the planarization layer having a flat top surface; and a multi-layer stack on the planarization layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED MATERIALS INC3050 BOWERS AVENUE SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beasley, Cara Scotts Valley, US 23 506
Foad, Majeed Sunnyvale, US 29 948
Hofmann, Ralf Soquel, US 67 1804
Michaelson, Timothy Milpitas, US 17 2620

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00