Water lubricated composite thrust bearing of nuclear main pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10208794
APP PUB NO 20180187720A1
SERIAL NO

15738094

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A water lubricated composite thrust bearing of a nuclear main pump has a stainless steel base and an engineering plastic layer. The stainless steel base is provided with a concave-convex surface connected to the engineering plastic layer. The concave-convex surface and the engineering plastic layer are compositely molded by means of thermoplastic compound molding. A ratio of the area of the concave-convex surface to the area of an orthographic projection of the concave-convex surface on the stainless steel base ranges from 1.2 to 2. By means of the concave-convex surface and a specific bonding property obtained after fusion of a rough face and the engineering plastic layer, the concave-convex surface is bonded with the engineering plastic layer, thereby forming a reliable composite thrust bearing that is physically connected onto a whole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DALIAN SANHUAN COMPOSITE MATERIAL TECHNOLOGY DEVELOPMENT CO LTD116000 NO 25 HAISHUN ROAD SANLIBAO LINGANG INDUSTRIAL ZONE JINPU NEW DISTRICT DALIAN CITY LIAONING PROVINCE DALIAN CITY LIAONING PROVINCE 116000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jian, Xigao Liaoning, CN 5 3
Liu, Changbo Liaoning, CN 8 2
Qu, Dazhuang Liaoning, CN 1 0
Sun, Chengyu Liaoning, CN 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00