Multi-channel upright reformer for fuel cell merged with heater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10207923
APP PUB NO 20160220975A1
SERIAL NO

14934583

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-channel upright reformer for a fuel cell is provided, which has a simple structure by breaking from an existing complicated channel structure to allow fluids such as fuel and vapor to be stably flow, thereby improving durability and achieving an efficient reforming reaction and an efficient operation of the fuel cell. A method for manufacturing compactly a reformer by minimizing an area where heat exchange is performed and expand of a fuel cell due to the resulting decrease in manufacturing cost. Also a reformer for semipermanently using by frequently exchanging a catalyst used in a reforming reaction and supply the reformer at a low price by significantly decreasing cost consumed for the catalyst is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HANJUNGNCS CO LTD(CHAESIN-DONG) 379 YEONGCHEONSANDAN-RO YEONGCHEON-SI GYEONGSANGBUK-DO 38899

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hwan Sik Yeongcheon-si, KR 5 0
Oh, Chang Dae Daejeon, KR 1 0
Seo, Jung-hyun Yeongcheon-si, KR 5 0
Shin, Hyeong-Kyun Gyeongsan-si, KR 1 0
Song, Jin hoon Goheung-gun, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00