Convertible support structures for shipping large machinery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10196199
APP PUB NO 20170349368A1
SERIAL NO

15169974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A progressive shipping stand includes a stage one assembly, and a stage two assembly. The stage one assembly and the stage two assembly together define a first profile, and the stage two assembly alone defines a second profile, smaller than the first profile. The stage two assembly may be attachable directly to a load. The stage two assembly is operable independently in a discrete support configuration and is selectively cooperable with the stage one assembly in a full support configuration. The shipping support allows for large machinery such as a turbine or the like to meet at least one shipping criteria that would not otherwise be feasible using a standard shipping support.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Demianovich, Nicholas Greenville, US 9 16
Mills, Jeffrey Patrick Greenville, US 9 50
Reddy, Asani Likhith Karnataka, IN 4 6
Venugopal, Setty Dinesh Karnataka, IN 15 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00