Composite structure and method for molding composite structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10195789
APP PUB NO 20170266874A1
SERIAL NO

15531871

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This structure is provided with a first composite material 11, a second composite material 12 joined to the first composite material 11 by a film adhesive 21 provided between the first composite material 11 and the second composite material 12, and a corner fillet part 13 provided on a corner part 15 formed by the first composite material 11 and the second composite material 12. The shape of the corner fillet part 13 is a design shape P designed in advance, and the corner fillet part 13 is formed by curing the film adhesive 21 after arranging the film adhesive 21 on the corner part 15 so as to fit into the design shape P.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Toshio Tokyo, JP 84 421
Ishida, Takashi Aichi, JP 336 3386
Kishimoto, Kazuaki Tokyo, JP 21 33
Koyama, Takayuki Tokyo, JP 46 260
Saito, Koichi Aichi, JP 280 2557
Takagi, Kiyoka Tokyo, JP 40 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00