Staged reaction plenum partition wall for furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190822
APP PUB NO 20160320127A1
SERIAL NO

15107545

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An array includes a plurality of refractory bricks, each having a substantially tubular body including a first end, an opposed second end, a central bore extending from the first end to the second end along the longitudinal length thereof and defining an inner surface of the refractory brick, and an outer surface extending from the first end to the second end along the longitudinal length thereof. The outer surface of each refractory brick has a shape that transitions axially between a plurality of hexagonal portions and non-hexagonal portions along the longitudinal lengths thereof, and the plurality of refractory bricks are arranged and interlocked with one another in a vertical and horizontal manner via mating members provided on the hexagonal portions of the outer surfaces thereof. A continuous plenum space is defined by the non-hexagonal portions of the refractory bricks arranged in the array.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLASCH PRECISION CERAMICS INC580 BROADWAY MENANDS NY 12204

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bolebruch, Jeffrey J Amsterdam, US 14 87
Collins,, III Edwin L Albany, US 4 21
Russell, William P Watervliet, US 7 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00