Gasification melting facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190768
APP PUB NO 20160348903A1
SERIAL NO

15114832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gasification melting facility comprises: a fluidized bed gasification furnace that generates pyrolysis gas by thermally decomposing waste and discharges incombustibles; a melting furnace into which the pyrolysis gas is fed; a pyrolysis gas passage that connects the fluidized bed gasification furnace and the melting furnace; a grinder that grinds the incombustibles discharged from the fluidized bed gasification furnace by passing the incombustibles through a plurality of rods; a vibratory sifter that screens the incombustibles ground in the grinder; a fixed amount feeder that feeds at a fixed amount the incombustibles that pass through the vibratory sifter, the fixed amount feeder including a plurality of transfer chambers rotatable between a position to receive the incombustibles from the vibratory sifter and a position to discharge the incombustibles; and an airflow conveyor that conveys the fixed amount of the incombustibles from the fixed amount feeder together with airflow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES ENVIRONMENTAL & CHEMICAL ENGINEERING CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayashi, Keiichi Yokohama, JP 56 462
Saito, Yoshihisa Yokohama, JP 26 140
Shirai, Toshimasa Yokohama, JP 10 35
Yoshimitsu, Norio Yokohama, JP 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00