Scaffold with scaffold holder receptable and use of an aperture in a scaffold pole

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190326
APP PUB NO 20180073258A1
SERIAL NO

15822191

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A facade scaffold includes an inner pole, an outer pole and a scaffold cross-bar between the inner and outer poles. A hollow pole portion of the inner pole has a first receiving through-aperture for a coupling for the attachment of a scaffold holder. A maximum distance between the first receiving through-aperture and a top side of the scaffold cross-bar is no more than 300 mm. The first receiving through-aperture is arranged below the top side of the scaffold cross-bar, or is realized above the top side of the scaffold cross-bar as a first elongated hole. The longitudinal axis of the first elongated hole is aligned parallel to the pole longitudinal axis of the hollow pole portion. The invention simplifies and accelerates the operation of assembling a scaffold holder on a scaffold and for a two-pole scaffold holder allows a passage height under the scaffold holder to be increased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERI GMBH89264 WEISSENHORN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mikic, Erzad Karlsruhe, DE 12 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00