Method and system for biomass hydrogasification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190066
APP PUB NO 20160304799A1
SERIAL NO

15192602

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a system and method for producing hydrocarbons from biomass. The method is particularly useful for producing substitute natural gas from forestry residues. Certain disclosed embodiments convert a biomass feedstock into a product hydrocarbon by fast pyrolysis. The resulting pyrolysis gas is converted to the product hydrocarbon and carbon dioxide in the presence of hydrogen and steam while simultaneously generating the required hydrogen by reaction with steam under prescribed conditions for self-sufficiency of hydrogen. Methane is a preferred hydrocarbon product. A system also is disclosed for cycling the catalyst between steam reforming, methanation and regeneration zones.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
G4 INSIGHTS INCBURNABY BRITISH COLUMBIA V5A 2H5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Babicki, Matthew L West Vancouver, CA 18 1035
Keefer, Bowie G Galiano Island, CA 62 5103
Ng, Edson North Vancouver, CA 9 213
Sellars, Brian G Coquitlam, CA 12 482

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00