Flexible bioreactor and support structure system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10184099
APP PUB NO 20160289620A1
SERIAL NO

15142811

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some embodiments include a system having a support structure configured to mechanically support a first bioreactor. The support structure can have a first frame and a second frame together being configured to mechanically support the first bioreactor in interposition between the first frame and the second frame. The first frame can maintain a first set point temperature of the first bioreactor through an exchange of thermal energy between the first frame and the first bioreactor when the first bioreactor is vitally supporting one or more first microorganisms and when the support structure is mechanically supporting the first bioreactor. Other embodiments of related systems and methods are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HELIAE DEVELOPMENT LLC578 E GERMANN ROAD GILBERT AS 85297

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bair, Candyce Peoria, US 3 3
Cizek, Luke Mesa, US 8 4
Hayden, Justin Phoenix, US 4 4
Mazur, Richard Phoenix, US 20 16
McCarty, Mason Scottsdale, US 6 4
Oelschlager, Mason Gilbert, US 7 4
Tram, Minh Duc Gilbert, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 22, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 22, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00