Method for removing mercury and selenium from sulfate-containing waste water

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10183879
APP PUB NO 20140367335A1
SERIAL NO

14303657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to a method for the removal of mercury and selenium from sulfate-containing waste water. The method may include the following steps: a) a mercury- and selenium-contaminated waste water with a known sulfate concentration is provided, b) barium sulfate (BaSO4) is precipitated from the provided waste water by the addition of a predefined amount of Ba2+ ions to the waste water, c) BaSO4 (if necessary together with other solids) is separated obtaining a low-solid waste water, d) the low-solid waste water is fed to an ion exchanger for the removal of mercury obtaining a waste water with a reduced mercury content, e) selenium and/or selenium compounds are removed from the waste water with the reduced mercury content and f) a sulfate-containing solution or solid is added to the waste water with a reduced selenium and/or selenium compound content in order to precipitate barium sulfate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STEAG ENERGY SERVICES GMBH45128 ESSEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hilger, Magdalena Köln, DE 2 2
Lauer, Thomas Essen, DE 5 15
Piedra-Garza, Luis Fernando Essen, DE 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 22, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 22, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00