Vibration power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10181805
APP PUB NO 20150137659A1
SERIAL NO

14411771

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Power generated by a vibration power generator utilizing an electret is efficiently supplied to a power supply load. A vibration power generator includes a first substrate and a second substrate configured to be moved relative to each other by external vibration while remaining opposite each other, a group of a plurality of electrets arranged in the relative movement direction on one surface side of the first substrate, and a group of electrodes arranged in the relative movement direction on a surface side of the second substrate opposite to the group of electrets, and including a first current collecting electrode and a second current collecting electrode. A power supply load to which power generated by the external vibration is supplied and which has an impedance lower than an internal impedance of the vibration power generator is electrically connected to each of the first and second current collecting electrodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMRON CORPORATIONKYOTO JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Masaki, Tatsuakira Kyoto, JP 10 33
Matsuura, Keiki Nara, JP 14 37
Nabeto, Misato Nara, JP 16 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 15, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 15, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00