Process and system for managing a bowling centre

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10166460
APP PUB NO 20160367885A1
SERIAL NO

15232278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process and a system for managing a bowling center, which includes one or more bowling lanes along which a bowl is rolled, one or more pin setting up machines at one end of the lane and one or more bowlers' bays at the opposite end of the lane, one or more overhead monitors or videos above the lane, one or more consoles or keyboards located at the one or more lanes, respectively, and allowing a user to enter data, an electronic control system set up to manage the bowling center, and in particular, a score program which calculates the score of the games played at the bowling center and displays the score, in particular at the respective overhead monitor. A visual signal is emitted at the respective lane to indicate that the lane is open and waiting for users.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUBICAAMF EUROPE SPAVIA DELLA CROCE COPERTA 15 BOLOGNA 40128

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baraldi, Massimo Bologna, IT 28 116
Fergacich, Dario Bologna, IT 4 9
Mai, Danilo San Giorgio di Piano, IT 4 9
Pancaldi, Stefano Minerbio, IT 4 9
Vaioli, Roberto Ozzano Dell'Emilia, IT 15 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 1, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00