Cycle-by-cycle peak current limiting in current mode buck/boost converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10164535
APP PUB NO 20180145593A1
SERIAL NO

15822110

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An SMPS current mode control loop with an adjusted cycle-by-cycle peak current limit for buck and boost (and bidirectional buck/boost) regulators. An SMPS regulator can include a PWM driver to drive switching control signals with a PWM duty cycle to an output terminal OUT, and a PWM controller to control the PWM duty cycle based on a current mode control loop that includes slope compensation to provide a signal VPK corresponding to a current sense signal from a current sense terminal CS, based on sensed peak current through the energy storage element, superimposed with an injected slope compensation current corresponding to a predefined slope compensation based on PWM duty cycle. Adjusted peak limit circuitry generates a signal VLMT corresponding to an adjusted peak current limit based on a pre-defined peak current limit threshold for the energy storage element, including generating a peak limit adjustment current corresponding to the injected slope compensation current, and combining the peak limit adjustment current with the pre-defined peak current limit threshold so that VLMT is substantially constant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD MS 3999 DALLAS TX 75243

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tisinger, Eric Wayne Chandler, US 2 84
Xi, Youhao Chandler, US 3 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00