Semiconductor device including oxide semiconductor stacked layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10158026
APP PUB NO 20160380108A1
SERIAL NO

15262547

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transistor includes oxide semiconductor stacked layers between a first gate electrode layer and a second gate electrode layer through an insulating layer interposed between the first gate electrode layer and the oxide semiconductor stacked layers and an insulating layer interposed between the second gate electrode layer and the oxide semiconductor stacked layers. The thickness of a channel formation region is smaller than the other regions in the oxide semiconductor stacked layers. Further in this transistor, one of the gate electrode layers is provided as what is called a back gate for controlling the threshold voltage. Controlling the potential applied to the back gate enables control of the threshold voltage of the transistor, which makes it easy to maintain the normally-off characteristics of the transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsubayashi, Daisuke Atsugi, JP 140 1945
Murayama, Keisuke Chigasaki, JP 29 527
Yamazaki, Shunpei Setagaya, JP 7534 239327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00