Enhanced turndown process for a bitumen froth treatment operation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10144876
APP PUB NO 20170130136A1
SERIAL NO

15415141

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for operating a bitumen froth treatment operation in turndown mode includes adding solvent to bitumen froth to produce diluted bitumen froth and separating it into diluted bitumen and solvent diluted tailings and in response to a reduction in bitumen froth flow recirculating part of the diluted bitumen into the bitumen froth and returning part of the solvent diluted tailings into the step of separating. A method for turndown of separation vessel for PFT includes sustaining the feed flow to vessel; maintaining solvent-to-bitumen ratio in the diluted bitumen froth; and retaining water, minerals and asphaltenes in a lower section of the vessel while sustaining an outlet flow. The use of diluted bitumen derived from PFT as a viscosity modifying agent of the bitumen froth and an associated process are also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORT HILLS ENERGY L PC/O FORT HILLS ENERGY CORPORATION P O BOX 2844 150-6TH AVENUE S W CALGARY AB T2P 3E3

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grappolini, Benjamin John Calgary, CA 2 11
Hann, Thomas Onoway, CA 6 37
Van, Der Merwe Shawn Calgary, CA 24 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00