Method for verifying the integrity of data transmission between a main upstream unit and a main downstream unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10142059
APP PUB NO 20170324515A1
SERIAL NO

15529420

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for verifying the integrity of data transmission between a main upstream unit (10a) and a main downstream unit (20a). The method includes the implementation of the following steps: a data-processing module (11a) of the main upstream unit (10a) generates a first frame (T1) including a packet (P1) of data to be transmitted and a cyclic redundancy code (E1) of the packet (P1); encapsulates the first frame (T1) in a second frame (T2) which also includes a cyclic redundancy code (C1) of the first frame (T1); encapsulates the cyclic redundancy code (E1) of the packet (P1) in a third frame (T3); the data-processing module (11b) of the at least one auxiliary upstream unit (10b) compares each of the cyclic redundancy codes (E1) extracted from the first frame (T1) with those extracted from the third frame (T3); and confirms the integrity of data transmission to the main downstream unit (20a) only if the comparison is positive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN ELECTRONICS & DEFENSEPARIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gallay, Olivier Boulogne-Billancourt, FR 13 108
Lhenoret, Sebastien Boulogne-Billancourt, FR 1 3
Tuzi, Christophe Boulogne-Billancourt, FR 3 25
Vandenbaviere, Yann Boulogne-Billancourt, FR 7 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00