Advanced braze joint for tube-to-tube connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10139023
APP PUB NO 20170198838A1
SERIAL NO

14992646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems for tube-to-tube connections are described herein. A device having an aperture for receiving a tube may comprise: an inlet portion comprising a first diameter, the inlet portion located at an inlet of the aperture; a braze filler collector portion located axially adjacent to the inlet portion comprising a second diameter, the second diameter being greater than the first diameter; a necked portion located axially adjacent to the braze filler collector portion comprising a third diameter, the third diameter being less than the first diameter and the second diameter; a flow surface comprising a fourth diameter, the fourth diameter being less than the third diameter, the flow surface defining a void; and a collection pocket located axially adjacent to the necked portion, the collection pocket configured to collect a braze filler material from the necked portion to prevent the braze filler material from contacting the flow surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS ROAD FARMINGTON CT 06032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clum, Carey East Hartford, US 77 223
Slavens, Thomas N Moodus, US 110 732

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00