Power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10138762
APP PUB NO 20150218971A1
SERIAL NO

14425912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system in which the combustion heat of hydrocarbon gas is used to heat the steam for power generation; at the same time, the exhaust heat thereof is used to dry and thy-distill low rank coal. The power generation system includes: a dry distillation step for dry-distilling low rank coal of high moisture content; a cooling step for cooling the fixed carbon obtained in the dry distillation step; a combustion step in which hydrocarbon gas obtained in the dry distillation step is used as the main fuel; and a power generation step in which there are provided a power generator moving a steam turbine by main steam generated in the combustion step and a condenser.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYUSHU ELECTRIC POWER CO INC1-82 WATANABE-DORI 2-CHOME CHUO-KU FUKUOKA-SHI FUKUOKA 8108720

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Tatsuro Fukuoka, JP 19 97
Hayashi, Jun-ichiro Fukuoka, JP 4 23
Matsuda, Seiichiro Fukuoka, JP 4 8
Matsushita, Yohsuke Fukuoka, JP 3 7
Mochida, Isao Fukuoka, JP 29 223
Yamamoto, Tsuyoshi Fukuoka, JP 324 4081

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00