Rail tie having embedded automatic differential settlement compensation apparatus using oil pressure for railroad tracks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10138604
APP PUB NO 20170009405A1
SERIAL NO

15120524

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

By supporting a space generated by a settlement of the track bed gravel or asphalt roadbed underneath a concrete rail tie with cylindrical rods, and installing the present invention, one each separately, on the left and right sides of the concrete rail tie, recovery from settlements is automatic, and the response to differential settlements of the left and right rails of the track due to the train load can be easily facilitated, and by installing pressure reducing valves on the upper part of the concrete rail ties, pressure can be reduced while maintaining the track system as is without having to dismantle the concrete rail ties, and accordingly the usability of the concrete rail ties can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA RAILROAD RESEARCH INSTITUTE176 CHEOLDOBANGMULGWAN-RO UIWANG-SI 437-757

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jin-Wook Seoul, KR 126 1545
Lee, Seong-Hyeok Gyeonggi-do, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00