Alkali recycle in cellulose spinning process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10138578
APP PUB NO 20160138200A1
SERIAL NO

14900904

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a method for the recovery of solvent in a process for preparation of regenerated cellulosic fibers using sodium hydroxide as solvent for cellulose dissolving in the manufacturing of a cellulose spinning dope wherein sodium hydroxide present in the spinning dope is at least partially recovered and recycled as sodium hydroxide from a cellulose fiber regeneration or cellulose coagulation step and wherein said cellulose fiber regeneration or cellulose coagulation step consists of a bath into which cellulose spinning dope is injected. Recovered sodium hydroxide may be directly or indirectly recycled from a cellulose fiber regeneration or cellulose coagulation step to a cellulose dissolving step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHK FIBRE ABNORRA VILLAVÄGEN 17 BJÄRRED 23734

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bialik, Marta Sköndal, SE 1 0
Hagström, Bengt Göteborg, SE 8 8
Hedlund, Artur Göteborg, SE 4 0
Köhnke, Tobias Göteborg, SE 7 2
Stigsson, Lars Bjärred, SE 32 270

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00